Quantcast
Viewing all articles
Browse latest Browse all 61813

Dax editor

On Friday I built a data model in powerbi desktop and published the draft version to powered. On Monday I did a little bit more work and locally saved the work I had done. I have since had some calamity befall my user profile and a whole bunch of files have been corrupted including the local pbix. I can at best revert to the friday morning model. Is there anyway that I can either:

  1. copy the DAX measures I wrote off the web version or
  2. bring back the entire model?

Friday was a really good day for me and I don’t feel smart enough to rewrite the measures.

Cheers

Sam


Viewing all articles
Browse latest Browse all 61813

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>