In Power BI Service we have Semantic model that are become "disconnected" (not sure what to call this). I've tred dropping the workspace from the pipeline; that did not change anything.
We cannot delete the semantic models in the Prod workspace. There are many reports connected to those models already.
What casuses this to happen?
How do we fix it?