Hello,
I have a table of "Parts replaced" and dates.
I need to send an alert if a part was replaced over X times in one week.
(that means that I need to follow on each parts and the number of time is was replaced per week. I have hunderds of parts so doing a single card\KPI for each parts is not realitic)
Is there a way I can do that?
(I know that alerts work with one value, but I have multiple value - a lot of parts replaced)
Thanks!