Hi,
Does anyone know if it's possible to refresh dataflows in parallel (lets call those dataflows 'A'), when they are connected to another dataflow ('B') which contains linked entities from 'A'? I can only seem to have one dataflow refesh at a time, the other will fail. There is also a minimum 30 min interval between scheduling refreshes, which would take too long to schedule all the dataflows I need. There's currently 9 dataflows set to incremental refresh so they only take about 5 mins each, but would need to be staged over 4.5 hours which isn't acceptable for my case (I have about a 1 hour window available to have refreshes completed) so currently the only way is to do this manually every day :(.
Alternatively I'm also wondering if this is actually/partially consequent of other current recognised issues around scheduled refreshes failing, and that the issue might soon just go away with a fix coming?
Any help appreciated!